Seven Locks Flight - Wilts & Berks Canal
(Pictures by R G Silverwood)
Part of the week's work was to
put the finishing touches to the
Also at lock four, the offside
wall was landscaped which meant
All the clay added behind the
wall required puddling, here
We took a little time out for
a tour of other sections of the
A very tidy looking lift bridge on one of the restored sections.
At lock two, we began
excavating the upper section to find
In some places, the walls
crumbled before our eyes. Plenty
Lock two at the end of the
week. We managed to begin to
Newborn volunteer Sophie lends
a hand with preparing
We made use of a wet afternoon
by taking a tour of the
|
|